Iron Ore Processing Project

2015-06-11 16:53:15

Processed Material: Iron Ore
Mine Method: Surface
Product Size: 0-10mm(90%≤0-8mm)
Work Time: 24h(2shift)
Ore Density: 3.6t/m³
Capacity: 150t/h
Grade: 8.6%

The evaluation by customer: We have higher requirements for the final product: grade ≥60%, raw material size≤150mm, product size 0-10mm. After their site investigations, the engineers of Zhongxin Heavy Industry have recommended us the HP Hydraulic Cone Crusher as the major crushing equipment, supplemented with Jaw Crusher. I was not expecting that, the equipments of Zhongxin Heavy Industry not only successfully accomplished the production tasks, but exceeded my expectations. Owing to the high production efficiency of equipments and satisfactory service of engineers, I have also suggested two surrounding steel mills to purchase this model.