1. before the start of the inspection
①To carefully check whether the fasteners fast, easyly wear parts need to be replaced or not, safety cover is complete or not.
②According to the physical properties of materials and the requirements of the material size, adjust the padboard and counterattack plate between the gap.
③Check the lubrication system
2.the note of the machine when it is on、off and operating.
①Boot start sequence: dust collection equipment → transport equipment → impact crusher → feeder. The first aircraft running, check to determine the phenomenon of no abnormalities and then feed.
②The material must be uniform feed, to prevent more than the provisions of the large feed material, to prevent metal block feeding.
③Often check the lubrication system and cooling system work, and pay attention to the bearing and motor bearing temperature. If more than the specified value, should be dealt with in a timely manner.
④Pay attention to equipment and dust collection workshop work.
⑤You should first stop feeding machine, the material will be boken after the body stopped after the machine, and then stop sending equipment and dust collection equipment. Be promptly check the fastening bolts, check the impact plate, counterattack plate wear.