A lot of users in the purchase of jaw crusher, the general use of the general will not appear any big problems, but in the long run, will have a certain impact on their performance. Some can not turn on, and some of the effects of rust, etc.. What matters should be paid attention to when the jaw crusher is stored:
First, the choice of storage location: long term use of jaw crusher is best stored in dry indoor. If there are special circumstances need to stop outside, must choose the flat ground and covered with wood, standing with cover cloth covers. In order to stop the airport layout and layout, we should ensure that the import and export of any machine is not influenced by other machines.
Second, remove the battery: long-term storage, should remove the jaw crusher battery. Place the battery in the dry and freezing point, and keep the surface clean and dry. When the battery is removed, the first to cut off the negative wire, and then cut off the positive line, the first to connect the positive cable, then connect the negative wire. The electrical system of engineering machinery is the negative electrode, this order is to prevent the battery caused by short circuit assembly. Lead acid batteries should be charged once a month.
Third, to prevent rust: jaw type crushing machine store should be seen outside surface antirust paint paint off the size of the area to determine the paint with patch or with the machine re painting the method of repair, the metal exposed part of the rust best to smear butter.
Forth, engine: in the jaw crusher stored before, drain the engine cooling water, replace the engine oil. New oil is usually neutral, will not corrode metal parts of the engine. Fuel tank fill diesel fuel tank, avoid rust, if conditions permit should also add preservatives. In the period of downtime should be a month to start the engine, so that the machine for a short distance, the purpose is to make the lubrication of the parts to establish a new oil film, to prevent rust. It should be noted that, before initiating should fill the cooling water, cooling water should be put at the end.