Work Note of Cone Crusher

2017-08-08 14:18:06

The production of cone crusher is related to the way of feeding, the amount of material to be supplied, the size of ore discharge, the physical and mechanical properties of ore, the temperature and so on. How to improve work efficiency? What are the operating points?

 cone crusher plant

1.Ore must be in the middle of the distribution disk, not allowed to direct ore into the crushing chamber. This makes it easy to prevent the crusher from overloading the liner. The correct ore conditions are: the ore is distributed evenly through the distribution disk in the crushing chamber, and the ore can not be higher than the level of the mortar wall.

2.The maximum size of the crusher is about 85% Otherwise it will lead to: the reduction of the crusher production, the damage of some parts of the cone crusher.

3.Crusher is not allowed to start the load, the load will cause an accident.

4.Parking, you must first stop the mine, and let the crushing chamber has been broken into the ore, the crusher to stop.

5.Crusher work should always check the pressure of the locking system and the work of the hydraulic station, found that the problem in a timely manner.